Language Arts Complex- Measure M:
Restoration of the concrete in the plaza area north of the construction site (behind the Bookstore) continues. Pedestrian traffic is allowed through the plaza outside the fencing. Inside the main construction site, concrete placement will commence later in the week bringing increased construction vehicle traffic. Cement trucks will enter and exit off of Goldenwest Street and move through the barricaded area in Parking Lot C. Trucks will access the construction site via the construction gate between the Math & Science bldg. and the LRC. Please mind flagmen and parking lot barricades, and avoid this area. There is no parking within the barricades. Roads and walkways within the fenced off construction site are not accessible to pedestrian traffic; please use alternate routes to get around Campus. Exercise caution around construction vehicles and areas surrounding the construction site. Noise level will be moderate for these activities. (See attached map [PDF] for work areas and construction vehicle routes)
General Note:
For any additional questions or clarifications, please email Mike Golden at mgolden7@gwc.cccd.edu for Measure M projects, and Frank Fonseca at ffonseca1@gwc.cccd.edu or Joe Dowling at jdowling@gwc.cccd.edu for Campus projects.